---
title: How to Secure Balusters in a Stair Railing
description: "On this page[Secure the Balusters in a Stair Railing](#)[Before You Begin](#)[Prerequisites](#)[What You Need To Know](#)[Tools Required](#)[Power Tools](#)[Hand Tools](#)[Supplies](#)[Materials](#)[Secure Stair Railing Balusters: Step by Step](#)[Step 1: Cut the Baluster and Check the Matching Holes](#)[Step 2: Slide On the Bottom Shoe](#)[Step 3:…"
url: "https://letsbuildstuff.co/learn/secure-baluster-in-stair-railing/"
updated: "2026-10-16"
category: Stairs/Handrails
tags:
  - Level 3
  - Supplemental Guide
---

# How to Secure Balusters in a Stair Railing

On this page[Secure the Balusters in a Stair Railing](#)[Before You Begin](#)[Prerequisites](#)[What You Need To Know](#)[Tools Required](#)[Power Tools](#)[Hand Tools](#)[Supplies](#)[Materials](#)[Secure Stair Railing Balusters: Step by Step](#)[Step 1: Cut the Baluster and Check the Matching Holes](#)[Step 2: Slide On the Bottom Shoe](#)[Step 3: Set and Secure the Baluster](#)[Step 4: Seat and Secure the Bottom Shoe](#)[Close-Out](#)[Quality Check](#)[Troubleshooting](#)[Stair Railing Baluster Questions](#)[Why are the balusters installed after paint?](#)[Do I need to check every baluster for plumb again?](#)[Does the standard install use two shoes?](#)[Do I mix a batch of baluster epoxy?](#)[Related Guides](#)

[Stairs/Handrails](/learn-category/stairs-handrails/) Skill Level: [Advanced (Level 3)](/learn/difficulty-levels/#level-3) · Estimated Time: 5-10 minutes per baluster

 **Keep this handy for your next project.** [Get the free tool reference & join the guide list](#lbs-guide-signup)

## Secure the Balusters in a Stair Railing

This guide covers the final securing of metal [balusters](/glossary/stairs/#baluster) in a stair railing. In Phase 2, cut each baluster to length, fit its bottom shoe and secure it with epoxy below and silicone above. Start only after [Phase 1: build the rail and drill the baluster holes](https://letsbuildstuff.co/learn/metal-balusters/) is complete. Each baluster must already have been dry-fit and checked for plumb, and the wood rail must be back from the painters.

The painters come between the two phases. First the crew builds the rail, drills the holes and checks the dry fit. The painters then paint or stain the wood before the crew returns to secure the balusters. These are two site visits and two pay units.

Once a baluster is cut, epoxied at the bottom, and siliconed at the top, it is not coming back out without a fight. Take the extra thirty seconds to check that it is in its matching top and bottom holes before you commit.

[How to Install Metal Balusters](https://www.youtube.com/embed/7ga3wmXQGx0)

[Watch the standard baluster install on YouTube](https://www.youtube.com/shorts/7ga3wmXQGx0).

![Completed stair railing with black metal balusters beneath a stained wood rail](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20251023_101804.jpg)
A completed stair railing with [metal balusters](/learn/metal-balusters/). This finished example does not show the concealed shoe, screw or epoxy detail.

## Before You Begin

### Prerequisites

- This baluster has already been drilled and dry-fit, and read plumb in both directions in that pass (see [Phase 1](https://letsbuildstuff.co/learn/metal-balusters/)).
- The rail has come back from the painters, finished and ready.
- This baluster gets secured with epoxy at the bottom and silicone at the top.
- The bottom [shoe](/glossary/stairs/#baluster-shoe) matched to this baluster is on hand. A top shoe is an unusual, job-specific exception.

### What You Need To Know

- Cut the baluster to length before it goes back into the floor and rail holes.
- The epoxy comes in a two-part dispenser tube and mixes as it passes through a mixing nozzle, shooting straight into the hole. There is no batch to mix. If you stop partway through the run, the epoxy sets up inside the nozzle and you need a new one to keep going, so run the whole set in one pass.
- Check that each baluster is in its matching top and bottom holes right before you commit. The holes were drilled plumb in Phase 1, so this pass is not a fresh plumb check. If a hole reads shallow or out of plumb, ream it with a spiral or twist bit, not a spade bit - holes should already exist at this stage, so a spade bit is backup only now.
- Shoes go on before the baluster is locked in place, you cannot add a shoe after the epoxy or silicone sets.
- If the run was set every third baluster first and checked for plumb before the rest were filled in, do the securing pass in that same order rather than straight down the line, so a drift problem shows up early.

## Tools Required

### Power Tools

- [23-gauge pin nailer](https://letsbuildstuff.co/learn/nail-guns-and-air/), for shoes that pin rather than snap into place
- Air compressor, to run the pin nailer

### Hand Tools

- Small applicator, for the silicone

### Supplies

- Epoxy dispenser tube with mixing nozzle, for securing the bottom of the baluster
- Silicone, for securing the top of the baluster
- Painter's tape, to protect the finished floor and rail from drips and to hold each shoe up while you secure the baluster bottom

### Materials

- Bottom shoe matched to this baluster

## Secure Stair Railing Balusters: Step by Step

### Step 1: Cut the Baluster and Check the Matching Holes

Before you commit anything, cut the baluster to length, then slide it back into its dry-fit position if it was pulled, and make sure it is seated in its matching top and bottom holes. Every baluster has its own pair of holes from Phase 1, and this is the check that it went back into the right pair. Cut on the band saw for the cleanest cut on metal; a jigsaw with a metal-cutting blade also works. Cut the longest pieces first. Stairs typically need three different lengths, a straight run is all one length.

### Step 2: Slide On the Bottom Shoe

Slide the bottom shoe onto the baluster from the bottom before it goes into the rail hole. If the baluster is already dry-fit in place, pull it just far enough to get the shoe on, you cannot add it after the baluster is locked. A top shoe is an unusual exception, not part of the standard install.

### Step 3: Set and Secure the Baluster

- Run a bead of silicone into the rail hole before anything else goes in. That dab is what keeps the baluster from rattling in the top hole, and you cannot add it once the baluster is seated.
- Put the baluster top into the siliconed rail hole, then drop the bottom into its matching floor hole.
- Secure the bottom in two steps. First drive a 1-1/4 inch coarse-thread screw to hold the baluster where you want it. Then run epoxy around all four sides to lock it for good.
- The screw holds the baluster in position while the epoxy grabs.

### Step 4: Seat and Secure the Bottom Shoe

**Hold the shoe up with painter's tape while you work the bottom of the baluster. Never use the shoe's set screw to do it.** Run that screw tight against the baluster to hold the shoe and it dimples the metal, and the next person who pulls a shoe down without thinking drags the screw the length of the baluster and scratches it. When the bottom is secured, pull the tape, drop the shoe to the floor, and then set the screw. Use the 23-gauge pin nailer for shoes that pin rather than snap, the small pin will not split the shoe material.

## Close-Out

Wipe any epoxy or silicone drips before they skin over, dried epoxy or silicone on a finished floor or rail is a much harder cleanup than catching it wet. Set any proud pin nails from the shoes below the surface. Sweep up and check that the bottom shoe fully covers the drilled hole with no gap showing, then move to the next baluster.

## Quality Check

- Baluster is in its own matching top and bottom holes
- Baluster does not move when gripped and tested by hand, no side play
- Bottom shoe is fully seated and secured, covering the drill hole completely
- Baluster is cut to length and seats fully in both holes without binding
- No epoxy or silicone residue visible on the floor, rail, or baluster finish
- Any pin nails from the shoes are set below the surface

## Troubleshooting

**Problem:** A baluster went back into the wrong holes between the dry fit and the final set.

**Solution:** This is exactly why Step 1 checks the matching holes. Move it to its own pair before the epoxy or silicone sets. Once epoxy cures, fixing it means drilling out the floor hole and starting that baluster over.

**Problem:** A shoe will not slide down, it binds on the baluster.

**Solution:** Metal balusters can vary slightly in diameter, and shoes hold tight tolerances. Try rotating the shoe, many are not perfectly round inside. If it still binds, lightly sand the inside of the shoe rather than forcing it with a hammer, which will scratch the finish or crack the shoe.

**Problem:** The baluster still has side play after the epoxy has fully cured.

**Solution:** The epoxy likely did not fill the gap around the baluster in the floor hole, often from not using enough or from the baluster shifting before it set. Drill the hole out, clean it, and reset the baluster with fresh epoxy rather than layering more on top of a bad bond.

## Stair Railing Baluster Questions

### Why are the balusters installed after paint?

The wood rail is finished between Phase 1 and Phase 2. That keeps the painters from having to mask around every metal baluster. Final securing belongs after that work, using the same matching holes established during the dry fit.

### Do I need to check every baluster for plumb again?

This pass checks that each baluster has returned to its own top and bottom holes. Those holes were already laid out and checked in Phase 1. Do not start fresh drilling or a new layout as part of the securing pass.

### Does the standard install use two shoes?

No. The standard method has a bottom shoe; a top shoe is unusual. Put the bottom shoe on before the baluster is locked in place. Hold it up with painter's tape while securing the bottom, then lower it and set its screw.

### Do I mix a batch of baluster epoxy?

No. Use the two-part dispenser tube with its mixing nozzle. The parts mix as you dispense them into the hole. Plan the run to avoid stopping and curing epoxy inside a nozzle; follow the epoxy maker's cure instructions before testing the finished connection.

**Something useful right now:** [Get the free tool & setup cheat sheet (PDF)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/06/finish-carpentry-tool-cheat-sheet.pdf). No signup required.

Signup requests are saved. Email delivery is not active yet. [Privacy policy](https://letsbuildstuff.co/privacy-policy/).

## Related Guides

- [How to Build a Handrail for Metal Balusters](https://letsbuildstuff.co/learn/metal-balusters/) - is Phase 1: it covers the spacing, code minimums, and full-run sequence this per-baluster task fits into.
- [How to Install a Newel Post](https://letsbuildstuff.co/learn/install-newel-post/) - the anchor points the whole rail and baluster system depends on.
- [How to Install Horizontal Bar Railing](https://letsbuildstuff.co/learn/install-horizontal-bar-railing/)

---

## Reference Photos

The following photos show examples of this type of work completed in the field. These serve as visual references for quality standards, proper installation techniques, and finished results.

Showing 14 of 14 photos

   [![Stained wood newel post and angled handrail guarding a stairwell opening, treads below covered for protection](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240226_113711-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240226_113711.jpg) Stained wood [newel post](/learn/install-newel-post/) and angled handrail guarding a stairwell opening, treads below covered for protection   [![Curved iron baluster railing with dark wood handrail and newel posts on a radius staircase](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240429_105219-1-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240429_105219-1-scaled.jpg) Curved iron baluster railing with dark wood [handrail](/learn/mount-handrail-wall/) and newel posts on a radius staircase   [![Two story stairwell with vertical black metal balusters, wood handrail, and large window](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240523_140139-300x225.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240523_140139.jpg) Two story stairwell with vertical black metal balusters, wood handrail, and large window   [![Unfinished wood newel post and handrail with mitered joint, drilled for balusters over rough treads](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240827_144401-1-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240827_144401-1-scaled.jpg) Unfinished wood newel post and handrail with mitered joint, drilled for balusters over rough treads   [![White painted newel posts with black metal balusters guarding a stair opening, hardwood floor](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20241004_141627-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20241004_141627-225x300.jpg) White painted newel posts with black metal balusters guarding a stair opening, hardwood floor   [![Wood stair stringer with rows of drilled holes for balusters above a switchback staircase](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20230906_171312-1-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20230906_171312-1-scaled.jpg) Wood [stair stringer](/learn/garage-steps-with-3-stringers/) with rows of drilled holes for balusters above a switchback staircase   [![Black metal rail rods anchored into a taped drywall stair corner, carpet treads visible nearby](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20250217_161752-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20250217_161752.jpg) Black metal rail rods anchored into a taped drywall stair corner, carpet treads visible nearby   [![Iron balusters mounted into wood stair treads with base plates, subfloor still unfinished](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20250312_134316-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20250312_134316.jpg) Iron balusters mounted into wood stair treads with base plates, subfloor still unfinished   [![Wood handrail drilled with peg holes for black metal balusters, one baluster partly set on tread](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20251016_120251-1-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20251016_120251-1-scaled.jpg) Wood handrail drilled with peg holes for black metal balusters, one baluster partly set on tread   [![Finished interior staircase with black metal baluster railing and carpet stair treads](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20231113_144943-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20231113_144943.jpg) Finished interior staircase with black metal baluster railing and carpet stair treads   [![Curved staircase with white painted balusters, wood handrail and newel post, treads still unfinished.](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20231111_133808-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20231111_133808.jpg) Curved staircase with white painted balusters, wood handrail and newel post, treads still unfinished.   [![Completed interior staircase with a carpet runner, iron baluster railing, and newel post](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240625_161743-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240625_161743.jpg) Completed interior staircase with a carpet runner, iron baluster railing, and newel post   [![Completed iron baluster railing with light wood newel posts along an upper hallway landing](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240625_161839-225x300.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20240625_161839.jpg) Completed iron baluster railing with light wood newel posts along an upper hallway landing   [![Black metal square stair balusters between top and bottom rails, above a textured carpet runner](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20250227_130146-1-300x225.jpg)](https://letsbuildstuff.co/website_ad59d41f/wp-content/uploads/2026/03/20250227_130146-1.jpg) Black metal square stair balusters between top and bottom rails, above a textured carpet runner    × ‹ ›

Written by **David Hospodka**, Sun’s Up Construction

David Hospodka learned finish carpentry from his father, alongside his brother Joel, and worked his way through college trimming houses. He then spent about ten years as a railroad bridge engineer, handling design, construction, maintenance and project management. He came back to finish carpentry full time in 2017.

[About Let’s Build Stuff](https://letsbuildstuff.co/about/)
