title: "Interior Window Frame for Medium-Tall Openings (90″ to 119″)"
description: "On this page[What Changes at This Height](#)[Additional Tools for Tall Interior Window Frame](#)[Tall Interior Window Frame Material Planning](#)[What’s Different Step-by-Step](#)[Step 1: Measure the Rough Opening and Wall Depth](#)[Step 2: Rip and Cut the Jamb Pieces](#)[Step 3: Assemble the Four-Sided Frame](#)[Step…"
url: "https://letsbuildstuff.co/learn/tall-interior-window-frame-medium/"
updated: "2026-09-27"
category: Moldings
tags:
  - Level 2
  - Supplemental Guide
---

# Interior Window Frame for Medium-Tall Openings (90″ to 119″)

On this page[What Changes at This Height](#)[Additional Tools for Tall Interior Window Frame](#)[Tall Interior Window Frame Material Planning](#)[What’s Different Step-by-Step](#)[Step 1: Measure the Rough Opening and Wall Depth](#)[Step 2: Rip and Cut the Jamb Pieces](#)[Step 3: Assemble the Four-Sided Frame](#)[Step 4: Install the Frame in the Rough Opening](#)[Steps 5 and 7: Install Door Stop (Both Sides)](#)[Step 8: Finish and Prepare for Casing](#)[Tall Interior Window Frame Solo Technique](#)[Tall Interior Window Frame Time Estimate](#)[Tall Interior Window Frame Quality Check](#)[Troubleshooting Tall Interior Window Frame Problems](#)[Side Piece Bows Between Shim Points](#)[Frame Racks During Insertion](#)[Upper Shims Slip Before Nailing](#)[Door Stop at Head Difficult to Install](#)[Related Guides](#)[Overview](#lbs-field-overview)[Steps](#lbs-field-steps)[Checks](#lbs-field-checks)[Fix a problem](#lbs-field-fix)

[Moldings](/learn-category/moldings/) Skill Level: [Intermediate (Level 2)](/learn/difficulty-levels/#level-2)

## What Changes at This Height

- **You need a step stool or stepladder.** The top of the opening is 8 to 10+ feet above the finished floor. From the ground, you cannot [shim](/glossary/doors/#shim) the head (wedge thin tapered pieces of wood behind the frame to hold it tight and straight), install the upper [door stop](/glossary/hardware/#door-stop-hardware), or check that the top sits flush (even with the wall, with no gap or bump).
- **The side pieces are 7.5 to 10 feet long.** Standard 1× stock often comes in 8-foot lengths. That may be barely enough, or too short. Get 10-foot or 12-foot stock instead.
- **The assembled frame is larger and heavier.** Sliding a four-sided frame this size into the opening takes more coordination. Be careful getting the top corners past the drywall edges without breaking the corner joints.
- **More measurement points are needed.** Measure the wall depth and gap at four to five points per side instead of three.
- **More shim points on the sides.** Plan for four to five shim points per side to prevent bowing between them.
- **Door stop installation at the top requires ladder work.** Both the first-side and second-side stops at the head of the frame have to go in from a ladder.

**Which guide do I need?**

- Windows you can reach without a ladder: [How to Install an Interior Window Frame](https://letsbuildstuff.co/learn/interior-window-frame/)
- **Windows 90 to 119 inches tall: this guide**
- Windows 120 inches and taller: [Interior Window Frame for Tall Openings (120″ and Above)](https://letsbuildstuff.co/learn/install-interior-frame-120-above/)

## Additional Tools for Tall Interior Window Frame

Everything in the [core guide tool list](https://letsbuildstuff.co/learn/interior-window-frame/), plus:

- **Step stool or 4-foot stepladder** - Sturdy enough to stand on while shimming and nailing at the top of the opening. A step stool works for openings up to about 100″. Taller openings in this range need a proper stepladder.
- **6-foot level (optional but helpful)** - Gives a better [plumb](/glossary/layout-and-shop-talk/#plumb-level-square-condition) read across the full length of 90″+ side pieces.

## Tall Interior Window Frame Material Planning

Before you start, check that your stock is long enough for the side pieces. Measure your tallest side piece. Add 2-3″ for waste at each end. Make sure your stock covers that total length. 10-foot or 12-foot lengths are the right stock for this [opening size](/glossary/doors/#rough-opening).

You need about double the door stop of a standard interior window frame. You still need stop for both sides of all four edges, but the side pieces are 50-100% longer than standard, so they use more material.

## What’s Different Step-by-Step

Follow the [core guide](https://letsbuildstuff.co/learn/interior-window-frame/) for the complete process. These are the modifications for 90-119″ openings:

### Step 1: Measure the Rough Opening and Wall Depth

Use the same measurement process, but take readings at **four to five points per side** instead of three. The gap and wall depth can shift between the bottom, where you can easily see, and the top, where you need a ladder.

### Step 2: Rip and Cut the Jamb Pieces

Use the same ripping process (cutting a board lengthwise, with the grain, to narrow its width). Support long pieces during the [table saw](/glossary/tools/#jobsite-table-saw) cut. Use a roller stand or outfeed table so the board doesn’t droop.

### Step 3: Assemble the Four-Sided Frame

Use the same assembly technique. A frame this size doesn’t fit on a standard workbench. Assemble it on the subfloor, or on sawhorses with plywood on top. Check squareness (whether the corners are true 90-degree angles) carefully. On longer sides, even a small error throws the whole frame out of square.

### Step 4: Install the Frame in the Rough Opening

Use the same shimming and nailing process, with these adjustments. Tilt the frame at a slight angle to feed it into the opening. Shim the sill first, then climb the ladder for the head. Use **four to five shim points per side**, spaced every 16″ to 20″. Nail from the top down, to lock the upper position first.

### Steps 5 and 7: Install Door Stop (Both Sides)

Use the same technique, but the upper stop pieces need ladder work. Pin-nail the head stop from the ladder. For the second-side stop, coordinate with the glazier (the person who installs the glass) to make sure the glass is fully in place before you climb up to install the upper stop.

### Step 8: Finish and Prepare for Casing

Check that each side piece sits flush along its **entire length**, not just at working height. Climb the ladder to check that the upper areas are flush with the drywall too.

## Tall Interior Window Frame Solo Technique

If you’re working alone, the biggest challenge is holding the assembled frame in position while shimming the top. Two approaches:

- **Bottom shim first:** Slide the frame in, shim the sill to hold it in place, then climb the ladder to shim the head and upper sides.
- **Temporary [cleat](/glossary/closets/#cleat):** Screw a scrap piece of 1×2 to the wall just below the opening to create a ledge. Rest the frame on the ledge while you shim from the ladder. Remove the cleat after nailing - two screw holes are easily patched.

## Tall Interior Window Frame Time Estimate

The [core guide](https://letsbuildstuff.co/learn/interior-window-frame/) covers standard openings (under 89″) where a typical interior window frame takes 45-60 minutes (not including glass installation). For an opening in the 90-119″ range, plan for **60-90 minutes**. The extra time comes from ladder repositioning, more shim points, and handling longer material.

## Tall Interior Window Frame Quality Check

Complete the full [core guide quality checklist](https://letsbuildstuff.co/learn/interior-window-frame/), then verify:

- **Side pieces are straight along the full length** - Sight down each side from the bottom. Longer pieces can bow between shim points.
- **Upper section is flush** - Climb the ladder and check flush at the top of each side and across the head.
- **Plumb check covers the full height** - Hold the level against the full side piece, not just the lower half.
- **Upper door stop is tight against glass** - Check from the ladder that the stop at the top is seated firmly.

## Troubleshooting Tall Interior Window Frame Problems

### Side Piece Bows Between Shim Points

This is the most common problem with a tall interior window frame. Add an extra shim point at the bow, push the piece flush, and nail through it. If you’re using MDF (medium-density fiberboard, a manufactured wood panel), shim every 12-16″ instead of 16-20″.

### Frame Racks During Insertion

A larger four-sided frame racks more easily (it twists out of square, so the rectangle leans into a parallelogram). If a corner joint pops apart, pull the frame back out. Re-glue and re-pin the joint, and let it set before you try again.

### Upper Shims Slip Before Nailing

Working overhead means gravity works against your shims. Wet the shim pairs slightly for friction, or dab hot glue on the shim tip before inserting.

### Door Stop at Head Difficult to Install

Working overhead makes it hard to hold the stop and the pin nailer at the same time. Tack one end of the stop first, then work along its length. A dab of [construction adhesive](/glossary/materials/#construction-adhesive) on the back of the stop helps hold it in place while you nail.

Every window frame in the 90″ to 119″ range comes down to the same three adjustments: taller stock, more shim points, and ladder work at the head. It is the exact same core guide process, just done from a step stool with longer material and a few extra shim points. Get those three things right and it goes together as cleanly as a standard frame. It just takes a little more time, and a sturdy ladder under you.

## Related Guides

For more on working at height during trim installations, see this guide from [OSHA on portable ladder safety](https://www.osha.gov/portable-ladder-safety).

- **Core Guide:** [How to Install an Interior Window Frame Like a Pro](https://letsbuildstuff.co/learn/interior-window-frame/) - Complete step-by-step process for standard-height openings (under 89″)
- [Interior Window Frame for Tall Openings (120″ and Above)](https://letsbuildstuff.co/learn/install-interior-frame-120-above/) - Full stepladder, two-person recommended, possible section assembly
- [Window Jamb Extension for Medium-Tall Windows (90″ to 119″)](https://letsbuildstuff.co/learn/tall-window-jamb-extension/) - Similar height challenges for exterior window [jamb](/glossary/doors/#jamb-head-jamb-hinge-side-jamb-strike-side-jamb-jamb-leg) work
- [Window Casing for Medium-Tall Windows (90″ to 119″)](https://letsbuildstuff.co/learn/tall-window-casing-medium/) - [Casing](/glossary/moldings/#casing) trim at this height range
- [How to Case a Window Like a Pro](https://letsbuildstuff.co/learn/case-a-window/) - The next step after the frame is installed
- [How to Install a Mullion Strip](https://letsbuildstuff.co/learn/install-mullion-strip/)

Written by **David Hospodka**, Sun’s Up Construction

David Hospodka learned finish carpentry from his father, alongside his brother Joel, and worked his way through college trimming houses. He then spent about ten years as a railroad bridge engineer, handling design, construction, maintenance and project management. He came back to finish carpentry full time in 2017.