Skip to content

Let's Build Stuff

  • Home
  • Start Here
  • Glossary
  • Learn
  • Blog
  • About
  • Contact
  • Browse the guides
Let's Build Stuff

How can we help you?

Closets

7
  • Closet and Cabinet Trim Parts
  • How to Install a Wire Shelf in a Closet
  • How to Install Granite Support
  • How to Install a Closet Countertop Shelf
  • How to Build Basic Closet Shelves - Part 1 of 3 (Standards)
  • How to Build Basic Closet Shelves - Part 2 of 3 (Layout Design)
  • How to Build Basic Closet Shelves - Part 3 of 3 (Building)

Doors & Openings

29
  • Door and Window Parts
  • How to Install a Knock-Down Hollow Metal Frame
  • Installing a Weather-Exposed Exterior Door: The Extra Steps
  • How to Install a Pocket Door Frame
  • How to Install Door Blinds
  • How to Resize a Door Opening
  • How to Install a Welded Hollow Metal Frame
  • How to Install a Door Bump
  • How to Install an Exterior Finish Slab
  • How to Install an 8'0" Pocket Door
  • How to Install an 8'0" Solid Core Pre-Hung Interior Door
  • How to Install an 8'0" Hollow Core Pre-Hung Interior Door
  • How to Install a 6'8" Solid Core Pre-Hung Interior Door
  • How to Install a 6'8" Cased Opening
  • How to Finish a Bypass Door Install
  • How to Install 8'0" Bi-Fold or Bypass Door Slabs
  • How to Install 6'8" Bi-Fold or Bypass Door Slabs
  • How to Install an 8'0" Bi-Fold or Bypass Door Frame
  • How to Install a 6'8" Bi-Fold or Bypass Door Frame
  • How to Install an Apartment Entry Slab Door with a Sweep
  • How to Install a Pre-Hung Door
  • How to Install a House-to-Garage Door
  • How to Install a Cased Opening
  • How to Install a Pocket Door for a Perfect Finish
  • How to Install Bifold Doors
  • How to Adjust an Exterior Door
  • How to Install Barn Doors
  • How to Install Bypass Doors
  • How to Install an Interior Center-Opening or French Door

General Carpentry

13
  • Which Material and Profile Goes Where
  • Exterior Trim Materials
  • Framing and Treated Lumber for the Trim Carpenter
  • Lumber Sizing, Grading, and Milling
  • Sheet Goods and Engineered Materials
  • Wood Species Field Guide
  • Choosing Nail Guns and Air Tools for Finish Carpentry
  • How the Guide Library Is Organized
  • Difficulty Levels Explained: What Levels 1, 2, and 3 Mean
  • Carpenter Hand Tools: What to Buy for Your Own Bag
  • Finish Carpentry Cheat Sheets and Printable References
  • How to Set a Barn Door Floor Guide
  • How to Trim a House, Start to Finish

Hardware

10
  • How to Install a Peep Sight
  • How to Install Privacy Pocket Door Hardware
  • How to Install Cabinet Hardware
  • How to Install a Window Blind in an Apartment
  • How to Install a Shower Rod in an Apartment Unit
  • How to Install Self-Closing Hinges
  • How to Install a Coat Hook
  • How to Install Address Numbers Total
  • How to Install Bath Accessories
  • How to Install a Lockset on a Door

Miscellaneous

2
  • How to Install Stock Trim Material
  • How to Install a Fire Extinguisher Cabinet

Moldings

28
  • Wall Treatments and Fireplace Trim Vocabulary
  • Trim Profiles: Casing, Base, and the Molding Families
  • How to Case Ganged Windows
  • How to Install Baby Shoe at Stair Nosing
  • How to Build a Custom Decorative Header
  • How to Install Crown Molding
  • How to Install an Interior Window Sill or Stool
  • How to Install a Transom Window Above a Door
  • Install Pre-Cut Shoe Molding, Nail Down
  • Make a Plinth Block
  • Install a Plinth Block at the Base of Casing
  • How to Install a Mullion Strip
  • Interior Window Frame for Tall Openings (120″ and Above)
  • Interior Window Frame for Medium-Tall Openings (90″ to 119″)
  • How to Install an Interior Window Frame
  • Window Jamb Extension for Tall Windows (120″ and Above)
  • Window Jamb Extension for Medium-Tall Windows (90″ to 119″)
  • How to Install a Window Jamb Extension Like a Pro
  • How to Case Tall Windows (10 Feet and Above)
  • Window Casing for Medium-Tall Windows (90″ to 119″)
  • How to Case One Side of an 8'0" Door
  • How to Case One Side of a 6'8" Door
  • How to Build an Attic Access Cover
  • How to Install Baseboard
  • How to Case One Side of an Exterior Door
  • How to Install Base Shoe
  • How to Case a Window
  • How to Install a Door Jamb Extension

Specialty

21
  • How to Install Vertical Shiplap
  • How to Install Herringbone Shiplap
  • How to Install Diagonal Shiplap
  • How to Install Chevron Shiplap
  • How to Hang a Mantel
  • How to Install LVP Flooring
  • How to Build a Floating Shelf
  • How to Install Decorative Wall Treatments
  • How to Install Ceiling Beams
  • How to Install a Butcher Block Countertop
  • How to Install a Mirror
  • How to Install Cabinets
  • How to Install Shiplap on a 3-Sided Fireplace Under 10'
  • How to Install Shiplap, 0' to 7'
  • How to Install Shiplap on a Ceiling
  • How to Install Shiplap 3 side fireplace wrap above 15'
  • How to Install Shiplap 3 side fireplace wrap 10'-15'
  • How to Install Shiplap on Walls Over 14 Feet Wide
  • How to Install Shiplap on a Wall 7 to 14 Feet Wide
  • How to Install a Locker Bench with Hooks
  • How to Install a Locker Bench with Cubbies

Stairs/Handrails

21
  • Stair Parts and Railing Vocabulary
  • How to Install Horizontal Bar Railing
  • How to Build a Handrail for Metal Balusters Like a Pro
  • How to Install a Wood Wall Cap
  • How to Install Wood Nosing
  • How to Install a False Tread Stair End Cap
  • How to Install Notched Skirt Boards
  • How to Install a Handrail Fitting
  • How to Install a Handrail Bracket
  • How to Install a Garage Step Handrail
  • How to Build Garage Steps with Closed Risers
  • How to Build Garage Steps with 3 Stringers (Open Risers)
  • How to Install a Straight Stair Riser
  • How to Install a Mitered Stair Riser
  • How to Secure and Finish a Stair Baluster
  • How to Install Stair Skirt Boards: Drop-In Method
  • How to Build a Wall-Mount Handrail
  • How to Mount a Handrail to the Wall
  • How to Install a Newel Post
  • How to Build Garage Steps with a Landing
  • How to Build Garage Steps: Safe, Code-Compliant Stairs
  • Home
  • Learn
  • Specialty
  • How to Install Diagonal Shiplap
View Categories

How to Install Diagonal Shiplap

0:00 / 10:31
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)
On this page
IntroductionBefore You BeginPrerequisitesWhat You Need To KnowTools RequiredPower ToolsHand ToolsSuppliesMaterialsHow to Install Diagonal ShiplapStep 1: Establish and Lay Out the AngleStep 2: Set the Miter Saw and Test ItStep 3: Install the First BoardStep 4: Build Out Course by CourseStep 5: Cut Every End to the AngleStep 6: Fit the Final BoardStep 7: Handle Outlets and SwitchesClose-Out After You Install Diagonal ShiplapQuality Check After You Install Diagonal ShiplapTroubleshootingThe angle is drifting across the wallA gap opens at the final boardBoards won't lie flatRelated Guides

Specialty Skill Level: Advanced (Level 3) · Estimated Time: 4-6 Hours per Wall

Introduction #

Diagonal shiplap runs boards across the wall at one consistent angle instead of level or plumb. It's a bold, less common look that takes more planning than horizontal or vertical, because the geometry has to hold across the whole wall, not just board to board.

The joinery hasn't changed. Shiplap today is tongue and groove, or sometimes flat square-edge boards run with a consistent gap. It is not a rabbet joint. Boards lock together on a diagonal wall the same way they do on a horizontal one.

What's genuinely different, and genuinely tricky, is the layout. You're establishing one angle and holding it across the entire wall, and every board has to meet the ceiling, floor, and side walls at that same angle. That geometry is the heart of this guide. Get it right at the start and hold it, and the wall looks intentional. Let it drift, and every course after shows the mistake.

No backer board goes up behind this or any shiplap style. We glue instead. This guide assumes you already know the basics of shiplap installation, and covers only what changes when the run goes diagonal; for a refresher on general paneling technique, Family Handyman is a solid reference.

Which guide do I need?

  • Straight boards running floor to ceiling: How to Install Vertical Shiplap
  • Straight boards angled across the wall: this guide
  • Mirrored boards meeting in a point: How to Install Chevron Shiplap
  • Two-direction boards woven into a zigzag: How to Install Herringbone Shiplap

Before You Begin #

Before you start, make sure these things are ready, and read through what you need to know below.

Prerequisites #

  • Wall surface ready (drywall, or the rare job where the GC put up OSB instead - their call)
  • Stud locations marked across the full wall, not just the starting corner
  • Material acclimated to room humidity for 48 hours, stacked flat with spacers between layers
  • Finish decided before ordering material: prefinished for a stained or clear-coat look, smooth MDF if painted
  • Angle chosen and the full layout snapped on the wall before any board is cut
  • Extra material ordered to cover the higher offcut waste a diagonal run produces

What You Need To Know #

  • We never install a backer ourselves, so plan the job for drywall: adhesive on the back of every board, plus a face nail wherever it crosses a stud. If the customer has sheeted the wall in OSB or plywood, take the win and fasten straight to it, no glue needed
  • The layout, not the joinery, makes diagonal hard: hold one angle across the entire wall. Every end cut, at the ceiling, floor, or a side wall, is that angle, never square
  • A small error in the angle compounds course by course. Check it against your layout line often, not just at the start
  • Diagonal eats far more material than horizontal, since most boards get two angled cuts instead of one square one. Order accordingly
  • We almost always face nail. On a diagonal wall the nail pattern is part of the look, so watch that heads don't catch the light
  • Most non-horizontal shiplap goes up prefinished, and a prefinished nail hole isn't a simple fill the way primed boards are - flag the finish before work starts

Tools Required #

Power Tools #

  • Miter saw with an accurate, repeatable angle stop - the wall depends on one angle holding true
  • 18-gauge brad nailer
  • Table saw (for ripping the back edge of the groove on the final board)
  • Stud finder
  • Jigsaw or oscillating multi-tool (outlet and switch cutouts)

Hand Tools #

  • Tape measure
  • Pencil
  • 6-foot level, or a chalk line, for striking the long diagonal layout lines
  • 4-foot, 2-foot, and 8-foot levels, for whatever a 6-foot level is the wrong size for
  • Speed square or T-bevel gauge, for setting and checking the angle
  • Utility knife

Supplies #

  • 18-gauge brad nails
  • Spacers (square-edge boards run with a gap - tongue and groove self-spaces)
  • Construction adhesive - carries the wall instead of a backer board, run a bead on the back of every piece
  • Wood glue (wood-to-wood joints, including the back-beveled edge on the final board)

Materials #

  • Shiplap boards, tongue and groove, or flat square-edge for a spaced look - never rabbeted
  • Prefinished boards for a stained or clear-coat look, the common choice for a diagonal accent wall
  • Smooth MDF if the wall is being painted - it doesn't split, and fills and sands easily

How to Install Diagonal Shiplap #

Work through layout before any board gets cut. Everything after that follows the line you strike in step one.

Step 1: Establish and Lay Out the Angle #

Decide the angle. Most diagonal walls run at 45 degrees, though the wall or the design can call for something else. Strike a chalk line, or use a 6-foot level, to lay out the first full-length reference line across the wall at that angle, then check a speed square or T-bevel against it every few feet, not just once at the start. This first line is the reference every board on the wall works from.

Pro Tip: Once you've verified the angle, mark the setting on your speed square or bevel gauge with tape so it can't shift over the course of the job.

Step 2: Set the Miter Saw and Test It #

Set the saw to the layout angle and cut a handful of test pieces from scrap. Lay them against your chalk line before you cut any good material. Half a degree of error is invisible on one board and obvious by the far side of the wall, so confirm it now, not four boards in.

Step 3: Install the First Board #

Start at the edge your layout calls for. Cut both ends to the layout angle, unless the board lands on an inside corner, where a square cut is correct. Run a bead of construction adhesive on the back, set the board to your line, and face nail wherever it crosses a stud (or the OSB, on the rare job the GC put that up instead of drywall). The glue is doing the job a backer board would otherwise do - don't skip it to save time.

Step 4: Build Out Course by Course #

Engage the tongue and groove, or hold the spacer gap on square-edge stock, gluing and face nailing every board the same way. Check the angle against your layout line every few boards - small corrections spread across several boards are invisible, one big correction on a single board is not.

Step 5: Cut Every End to the Angle #

Every board terminates against the ceiling, the floor, or a side wall at the same angle you started with, never square. Measure and cut each end individually - the boundary distance changes board to board, so don't batch-cut these to one length. Save the offcuts. On a single-direction diagonal run, the piece trimmed off one end is often already the right angle to start the next course, which cuts down on waste.

Step 6: Fit the Final Board #

The last piece in a run rarely drops in clean. Take several measurements across the opening rather than one - the gap width is rarely constant on a diagonal course. Rip the back edge of the groove off the final board so it drops straight into place instead of angling in sideways to engage the joint, which there usually isn't room to do. Then back-bevel the cut face edge about 10 degrees, so the front makes contact first and the face sits tight.

Step 7: Handle Outlets and Switches #

Mark outlet and switch locations on the board, accounting for the angle when you transfer the measurement, and cut from the back to avoid tear-out on the finish face. Turn off power at the breaker before you cut or nail anywhere near a box.

Close-Out After You Install Diagonal Shiplap #

Close it out the same way every shiplap wall gets closed out:

  • Set every nail below the surface, nothing proud, and check the wall under a raking light for any head that still catches the eye.
  • Wipe any glue squeeze-out while it's still wet, before it skins over and has to be scraped.
  • Sweep up - cutoffs collected, dust off the floor and sill. Diagonal cutting leaves more offcuts than horizontal, so budget the extra time.
  • Install trim at the ceiling, floor, and side walls where the run terminates.
  • Install outlet and switch plate covers once the finish work is done.

Filling nail holes, caulking, fine-sanding, and painting are the painter's scope, same as any wall. Ours is the glue, putty, and sanding at wood-to-wood joints, like the back-beveled edge on the final board. One flag before the painter arrives: most diagonal walls go up prefinished, and a prefinished hole isn't a standard fill. Ordinary filler won't blend into a factory finish, so make sure whoever fills holes has a color-matched product for that finish, not the general-purpose filler used on paint-grade boards.

Quality Check After You Install Diagonal Shiplap #

  • Angle is identical everywhere, no visible drift from one side of the wall to the other
  • Every end cut at the ceiling, floor, and side walls matches the layout angle, not square
  • Reveals or gaps are consistent from board to board
  • Boards are tight at the tongue and groove, or the gap is consistent on square-edge stock
  • Every nail is set below the surface, no heads catching the light under a raking glance
  • Glue is cleaned off every joint, no dried squeeze-out left on the face
  • No warped or bowed boards visible
  • The final board is tight, with no forced or filled gap
  • Outlet and switch cutouts are clean and fully covered by plates

Troubleshooting #

Even with careful layout, problems come up. Here are the most common ones on a diagonal wall.

The angle is drifting across the wall #

Small errors compound course by course and only show up once they've added up. Check every few boards against your layout line, not just at the start. Catch it early and spread the correction over several boards. Catch it late, and you may need to pull courses and reset from your last known good line.

A gap opens at the final board #

This is normal on a diagonal run, not a sign something went wrong earlier. Take several measurements across the opening, rip the back edge of the groove off the final board so it drops straight in, and back-bevel the face edge about 10 degrees so the visible edge sits tight.

Boards won't lie flat #

Without a backer board, the glue bond and nail pattern are what hold each board to the wall, so an uneven surface shows up faster than it would over plywood. Add adhesive and nail a little tighter at low spots, and confirm you're actually hitting a stud or the OSB, not just drywall.

Related Guides #

  • How to Install Shiplap, 0' to 7' - the core guide this one builds on
  • How to Install Shiplap 4, Ceiling - another orientation supplement
  • How to Trim a House, Start to Finish
  • Essential Carpenter Hand Tools
  • How to Install Vertical Shiplap
  • How to Install Herringbone Shiplap
  • How to Install Chevron Shiplap

Written by David Hospodka, Sun’s Up Construction

David Hospodka learned finish carpentry from his father, alongside his brother Joel, and worked his way through college trimming houses. He then spent about ten years as a railroad bridge engineer, handling design, construction, maintenance and project management. He came back to finish carpentry full time in 2017.

About Let’s Build Stuff

Level 3, Supplemental Guide
What are your Feelings

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Still stuck? How can we help?

Still stuck? How can we help?

Updated on October 7, 2026
How to Install Herringbone ShiplapHow to Install Chevron Shiplap

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Table of Contents
  • Introduction
  • Before You Begin
    • Prerequisites
    • What You Need To Know
  • Tools Required
    • Power Tools
    • Hand Tools
    • Supplies
    • Materials
  • How to Install Diagonal Shiplap
    • Step 1: Establish and Lay Out the Angle
    • Step 2: Set the Miter Saw and Test It
    • Step 3: Install the First Board
    • Step 4: Build Out Course by Course
    • Step 5: Cut Every End to the Angle
    • Step 6: Fit the Final Board
    • Step 7: Handle Outlets and Switches
  • Close-Out After You Install Diagonal Shiplap
  • Quality Check After You Install Diagonal Shiplap
  • Troubleshooting
    • The angle is drifting across the wall
    • A gap opens at the final board
    • Boards won't lie flat
  • Related Guides
Let's Build Stuff
  • Glossary
  • Learn
  • Blog
  • About
  • Contact
  • Affiliate Disclosure
  • Privacy Policy

© 2026 Let's Build Stuff - Interior Finish Carpentry Experts

  • Home
  • Start Here
  • Glossary
  • Learn
  • Blog
  • About
  • Contact
  • Browse the guides